Substation Scout

Panola, MS interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 8 with terminal status (shown grayed).

1active projects
100active MW
9total filed
Queue IDProjectkVMWResourceStatus
J3450 Not reported 230 200 Solar Withdrawn
J670 Not reported n/r 200 Solar Withdrawn
J4067 Not reported n/r 180 Battery Withdrawn
J2721 Not reported 115 120 Solar Withdrawn
J2825 Not reported 115 100 Hybrid Withdrawn
J2957 Not reported 115 100 Hybrid Active
J3150 Not reported n/r 100 Solar Withdrawn
J3772 Not reported 115 100 Solar Withdrawn
J588 Not reported 115 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.