Substation Scout

Osceola, MI interconnection queue

2 active projects totaling 250 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
250active MW
4total filed
Queue IDProjectkVMWResourceStatus
J307 Not reported n/r 201 Wind Withdrawn
J3287 Not reported n/r 200 Solar Active
G755 Not reported 69 50 Wind Withdrawn
J3066 Not reported n/r 50 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first