2 active projects totaling 250 MW in the MISO queue, plus 8 with terminal status (shown grayed).

2active projects
250active MW
10total filed
Queue IDProjectkVMWResourceStatus
G581 Not reported 345 600 Coal Withdrawn
H082 Not reported 345 500 Wind Withdrawn
J713 Not reported 230 300 Wind Withdrawn
J2080 Not reported 230 200 Wind Active
J3182 Not reported n/r 200 Hybrid Withdrawn
J511 Not reported 230 200 Wind Withdrawn
J1888 Not reported 230 175 Wind Withdrawn
G502 Not reported n/r 50 Wind Operational
G659 Not reported 230 50 Wind Withdrawn
J766 Not reported 230 3.8 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.