Oliver, ND interconnection queue
2 active projects totaling 250 MW in the MISO queue, plus 8 with terminal status (shown grayed).
2active projects
250active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G581 | Not reported | 345 | 600 | Coal | Withdrawn |
| H082 | Not reported | 345 | 500 | Wind | Withdrawn |
| J713 | Not reported | 230 | 300 | Wind | Withdrawn |
| J2080 | Not reported | 230 | 200 | Wind | Active |
| J3182 | Not reported | n/r | 200 | Hybrid | Withdrawn |
| J511 | Not reported | 230 | 200 | Wind | Withdrawn |
| J1888 | Not reported | 230 | 175 | Wind | Withdrawn |
| G502 | Not reported | n/r | 50 | Wind | Operational |
| G659 | Not reported | 230 | 50 | Wind | Withdrawn |
| J766 | Not reported | 230 | 3.8 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.