Ohio, KY interconnection queue

1 active project totaling 100 MW in the MISO queue, plus 4 with terminal status (shown grayed).

1active projects
100active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2282 Not reported 161 100 Hybrid Withdrawn
J2739 Not reported n/r 100 Solar Active
J2073 Not reported 345 91.5 Hybrid Withdrawn
J2137 Not reported 345 78.2 Hybrid Withdrawn
J2145 Not reported n/r 50 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.