Ogemaw, MI interconnection queue

2 active projects totaling 435.8 MW in the MISO queue, plus 3 with terminal status (shown grayed).

2active projects
435.8active MW
5total filed
Queue IDProjectkVMWResourceStatus
J3274 Not reported 138 290 Solar Active
J2732 Not reported 138 250 Hybrid Withdrawn
J3437 Not reported 345 160 Hybrid Withdrawn
J3761 Not reported 138 145.8 Solar Active
J3227 Not reported 345 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.