Oakland, MI interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
J451 Not reported n/r 500 Gas Withdrawn
J3362 Not reported 345 300 Battery Withdrawn
J3734 Not reported n/r 150 Battery Withdrawn
J989 Not reported 138 80 Solar Withdrawn
J010 Not reported n/r 23 Coal Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.