Substation Scout

Newton, TX interconnection queue

1 active project totaling 175 MW in the MISO queue, plus 5 with terminal status (shown grayed).

1active projects
175active MW
6total filed
Queue IDProjectkVMWResourceStatus
J539 Not reported n/r 999 Gas Withdrawn
J3409 Not reported 500 400 Solar Withdrawn
J369 Not reported n/r 393 Gas Withdrawn
J2629 Not reported 138 175 Solar Active
J2688 Not reported 138 130 Hybrid Withdrawn
J1907 Not reported n/r 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.