Newton, IN interconnection queue

6 active projects totaling 1,150 MW in the MISO queue, plus 8 with terminal status (shown grayed).

6active projects
1,150active MW
14total filed
Queue IDProjectkVMWResourceStatus
J3910 Not reported n/r 300 Wind Active
J3564 Not reported n/r 275 Wind Active
J3846 Not reported n/r 275 Wind Active
J1662 Not reported 138 200 Solar Withdrawn
J2226 Not reported 138 200 Solar Withdrawn
J3503 Not reported 345 200 Solar Withdrawn
J270 Not reported 138 197.8 Wind Withdrawn
J1646 Not reported n/r 150 Solar Active
J3673 Not reported 138 150 Solar Withdrawn
J257 Not reported 138 149.5 Wind Withdrawn
G967 Not reported 138 101 Wind Withdrawn
J2044 Not reported 138 100 Solar Active
J2045 Not reported 138 50 Battery Active
J2782 Not reported 69 38 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.