Substation Scout

Moultrie, IL interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
G677 Not reported 138 275 Coal Withdrawn
J3345 Not reported n/r 200 Solar Withdrawn
J3222 Not reported 345 109 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first