Substation Scout

Morgan, IN interconnection queue

2 active projects totaling 1,103.8 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
1,103.8active MW
3total filed
Queue IDProjectkVMWResourceStatus
J238 Not reported 138 725 Gas Operational
J3666 Not reported 345 378.8 Gas Active
J3557 Not reported 138 200 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.