Morehouse Parish, LA interconnection queue
11 active projects totaling 1,750 MW in the MISO queue, plus 18 with terminal status (shown grayed).
11active projects
1,750active MW
29total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J4141 | Not reported | 500 | 650 | Gas | Withdrawn |
| J2706 | Not reported | 500 | 500 | Solar | Withdrawn |
| J3454 | Not reported | 500 | 300 | Solar | Active |
| J2371 | Not reported | 115 | 250 | Solar | Active |
| J3067 | Not reported | 115 | 200 | Solar | Withdrawn |
| J3573 | Not reported | 115 | 200 | Solar | Withdrawn |
| J3601 | Not reported | 115 | 200 | Solar | Active |
| J3885 | Not reported | 115 | 200 | Solar | Withdrawn |
| J1551 | Not reported | 115 | 195 | Solar | Withdrawn |
| J1851 | Not reported | 115 | 185 | Solar | Active |
| J2965 | Not reported | n/r | 180 | Wind | Active |
| J2325 | Not reported | 115 | 175 | Battery | Withdrawn |
| J2525 | Not reported | 115 | 175 | Solar | Withdrawn |
| J3603 | Not reported | 115 | 175 | Solar | Withdrawn |
| J3118 | Not reported | 115 | 160 | Hybrid | Active |
| J3663 | Not reported | 115 | 150 | Solar | Withdrawn |
| J697 | Not reported | 115 | 150 | Solar | Operational |
| J1933 | Not reported | 115 | 100 | Solar | Withdrawn |
| J2956 | Not reported | 115 | 100 | Hybrid | Active |
| J605 | Not reported | n/r | 100 | Solar | Withdrawn |
| J1827 | Not reported | n/r | 90 | Solar | Active |
| J3988 | Not reported | 115 | 85 | Solar | Active |
| J581 | Not reported | 115 | 70 | Solar | Withdrawn |
| J1436 | Not reported | 115 | 50 | Solar | Operational |
| J2011 | Not reported | 115 | 50 | Battery | Withdrawn |
| J3452 | Not reported | 500 | 50 | Battery | Withdrawn |
| J3600 | Not reported | 115 | 50 | Battery | Withdrawn |
| J665 | Not reported | n/r | 47.5 | Solar | Withdrawn |
| J674 | Not reported | n/r | 47.5 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.