Substation Scout

Montgomery, MO interconnection queue

2 active projects totaling 200 MW in the MISO queue, plus 4 with terminal status (shown grayed).

2active projects
200active MW
6total filed
Queue IDProjectkVMWResourceStatus
J2726 Not reported 345 248 Solar Withdrawn
J2425 Not reported 345 150 Solar Withdrawn
J2438 Not reported 345 150 Battery Withdrawn
J1352 Not reported 345 100 Solar Active
J2179 Not reported n/r 100 Solar Active
J987 Not reported 161 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first