Substation Scout

Montgomery, IL interconnection queue

6 active projects totaling 894.2 MW in the MISO queue, plus 7 with terminal status (shown grayed).

6active projects
894.2active MW
13total filed
Queue IDProjectkVMWResourceStatus
J3556 Not reported 345 250 Solar Active
J205 Not reported 138 200 Wind Withdrawn
J2607 Not reported 138 200 Battery Active
J463 Not reported n/r 200 Solar Withdrawn
J2334 Not reported n/r 195 Solar Active
J2937 Not reported 138 186 Solar Active
G915 Not reported 345 150 Wind Withdrawn
J1324 Not reported 138 150 Solar Withdrawn
J2196 Not reported 138 100 Hybrid Withdrawn
J1201 Not reported 138 44.2 Hybrid Active
G806 Not reported n/r 19 Coal Operational
J3507 Not reported 138 17 Solar Withdrawn
J882 Not reported 138 15 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first