Montcalm, MI interconnection queue

8 active projects totaling 1,347 MW in the MISO queue, plus 5 with terminal status (shown grayed).

8active projects
1,347active MW
13total filed
Queue IDProjectkVMWResourceStatus
J1043 Not reported 345 374.4 Wind Withdrawn
J3887 Not reported 345 300 Wind Active
J271 Not reported n/r 232 Gas Withdrawn
J3696 Not reported 345 225 Battery Active
J1379 Not reported 138 200 Solar Active
J2454 Not reported 138 150 Battery Active
J2619 Not reported 345 140 Hybrid Active
J1918 Not reported 345 132 Solar Active
J1921 Not reported 138 125 Solar Withdrawn
J2057 Not reported 345 100 Hybrid Active
J2069 Not reported 138 100 Hybrid Active
J608 Not reported 138 100 Wind Withdrawn
J978 Not reported 138 100 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first