Monroe, AR interconnection queue

2 active projects totaling 300 MW in the MISO queue, plus 10 with terminal status (shown grayed).

2active projects
300active MW
12total filed
Queue IDProjectkVMWResourceStatus
J3540 Not reported 230 400 Solar Withdrawn
J907 Not reported 230 200 Solar Operational
J3127 Not reported 115 160 Solar Withdrawn
J1280 Not reported 115 100 Solar Withdrawn
J1434 Not reported 230 100 Solar Operational
J2141 Not reported 115 100 Solar Withdrawn
J2184 Not reported 115 100 Hybrid Withdrawn
J3034 Not reported 115 100 Solar Withdrawn
J1261 Not reported 115 90 Solar Withdrawn
J2637 Not reported 115 64.5 Solar Withdrawn
J924 Not reported 230 50 Battery Withdrawn
J1789 Not reported 115 6 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.