Minnehaha, SD interconnection queue

1 active project totaling 205 MW in the MISO queue, plus 7 with terminal status (shown grayed).

1active projects
205active MW
8total filed
Queue IDProjectkVMWResourceStatus
G764 Not reported 115 241.5 Wind Withdrawn
G370 Not reported n/r 205 Gas Operational
H016 Not reported 115 200 Wind Withdrawn
H025 Not reported n/r 200 Wind Withdrawn
J189 Not reported n/r 200 Wind Withdrawn
G827 Not reported 115 100 Wind Withdrawn
G829 Not reported 115 100 Wind Withdrawn
G763 Not reported 115 50 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.