Substation Scout

Miami, IN interconnection queue

3 active projects totaling 622.9 MW in the MISO queue, plus 7 with terminal status (shown grayed).

3active projects
622.9active MW
10total filed
Queue IDProjectkVMWResourceStatus
J1743 Not reported 345 292.9 Solar Active
J2709 Not reported n/r 228 Solar Withdrawn
J3719 Not reported 230 200 Solar Active
J1018 Not reported 230 150 Wind Withdrawn
J2307 Not reported 230 130 Solar Active
J1678 Not reported 345 74.7 Battery Withdrawn
J3390 Not reported 69 37 Solar Withdrawn
J2308 Not reported 230 35 Battery Withdrawn
J1150 Not reported 345 30 Wind Withdrawn
J2778 Not reported 69 15 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.