Substation Scout

Mercer, ND interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 11 with terminal status (shown grayed).

0active projects
0active MW
11total filed
Queue IDProjectkVMWResourceStatus
J2665 Not reported 345 347 Hybrid Withdrawn
J2883 Not reported 345 347 Hybrid Withdrawn
J2912 Not reported 345 347 Hybrid Withdrawn
J3415 Not reported n/r 250 Solar Withdrawn
J081 Not reported 161 200 Wind Withdrawn
J090 Not reported 230 200 Wind Withdrawn
J2772 Not reported 345 200 Hybrid Withdrawn
J1187 Not reported 230 151.8 Wind Withdrawn
J082 Not reported 161 100 Wind Withdrawn
G531 Not reported n/r 68 Coal Withdrawn
G607 Not reported n/r 25 Coal Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.