Substation Scout

Mchenry, ND interconnection queue

2 active projects totaling 111 MW in the MISO queue, plus 3 with terminal status (shown grayed).

2active projects
111active MW
5total filed
Queue IDProjectkVMWResourceStatus
J1754 Not reported n/r 200 Wind Withdrawn
J746 Not reported 230 200 Wind Withdrawn
G830 Not reported n/r 99 Wind Operational
G328 Not reported n/r 12 Wind Withdrawn
G408 Not reported 115 12 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.