Mccracken, KY interconnection queue

1 active project totaling 60 MW in the MISO queue, plus 3 with terminal status (shown grayed).

1active projects
60active MW
4total filed
Queue IDProjectkVMWResourceStatus
G070 Not reported n/r 900 Other Withdrawn
J2547 Not reported 161 150 Solar Withdrawn
J2548 Not reported 161 75 Battery Withdrawn
J1649 Not reported 69 60 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.