Martin, IN interconnection queue

1 active project totaling 17.3 MW in the MISO queue, plus 1 with terminal status (shown grayed).

1active projects
17.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1356 Not reported 138 160 Solar Withdrawn
J453 Not reported 69 17.3 Solar Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.