Marshall, IN interconnection queue
3 active projects totaling 358 MW in the MISO queue, plus 8 with terminal status (shown grayed).
3active projects
358active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3693 | Not reported | 345 | 300 | Battery | Withdrawn |
| J2213 | Not reported | n/r | 200 | Battery | Active |
| J156 | Not reported | 138 | 185.6 | Wind | Withdrawn |
| J1802 | Not reported | 138 | 150 | Solar | Active |
| J214 | Not reported | 138 | 150 | Wind | Withdrawn |
| J2418 | Not reported | 138 | 140 | Battery | Withdrawn |
| J3226 | Not reported | 138 | 130 | Hybrid | Withdrawn |
| J3938 | Not reported | 138 | 123 | Solar | Withdrawn |
| J3348 | Not reported | 138 | 110 | Solar | Withdrawn |
| J1273 | Not reported | 138 | 100 | Solar | Withdrawn |
| J256 | Not reported | 69 | 8 | Gas | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.