Substation Scout

Marshall, IL interconnection queue

3 active projects totaling 313 MW in the MISO queue, plus 2 with terminal status (shown grayed).

3active projects
313active MW
5total filed
Queue IDProjectkVMWResourceStatus
J2247 Not reported n/r 178 Wind Active
J128 Not reported 138 100 Wind Withdrawn
J265 Not reported n/r 100 Wind Withdrawn
J715 Not reported 138 100 Wind Operational
J3188 Not reported 138 35 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.