Marshall, IA interconnection queue
8 active projects totaling 2,401.2 MW in the MISO queue, plus 7 with terminal status (shown grayed).
8active projects
2,401.2active MW
15total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| E0010 | Not reported | 345 | 798.2 | Gas | Active |
| J233 | Not reported | n/r | 700 | Gas | Operational |
| G128 | Not reported | n/r | 600 | Other | Withdrawn |
| G180 | Not reported | n/r | 600 | Gas | Withdrawn |
| G720 | Not reported | n/r | 600 | Coal | Withdrawn |
| J4056 | Not reported | 345 | 310 | Wind | Active |
| J4068 | Not reported | 345 | 232 | Wind | Active |
| H085 | Not reported | 161 | 200 | Wind | Withdrawn |
| J563 | Not reported | 161 | 150 | Wind | Withdrawn |
| H078 | Not reported | 161 | 121 | Wind | Operational |
| J562 | Not reported | 161 | 119.6 | Wind | Withdrawn |
| J2949 | Not reported | 161 | 100 | Battery | Active |
| J2948 | Not reported | n/r | 75 | Gas | Active |
| J514 | Not reported | n/r | 65 | Gas | Active |
| J3548 | Not reported | n/r | 62 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.