2 active projects totaling 21 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
21active MW
4total filed
Queue IDProjectkVMWResourceStatus
J2354 Not reported n/r 65 Solar Withdrawn
G327 Not reported 138 19 Other Operational
G320 Not reported n/r 8 Other Withdrawn
G326 Not reported 138 2 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.