0 active projects totaling 0 MW in the MISO queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
J3273 Not reported 500 473.8 Wind Withdrawn
J3377 Not reported 115 150 Solar Withdrawn
J3534 Not reported 115 125 Hybrid Withdrawn
J1351 Not reported 115 120 Solar Withdrawn
J582 Not reported n/r 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.