Madison, IN interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 3 with terminal status (shown grayed).

1active projects
150active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3831 Not reported 345 240 Gas Withdrawn
J1357 Not reported 138 150 Battery Active
J1731 Not reported 345 100 Battery Withdrawn
J2777 Not reported 69 35 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.