Madison, IA interconnection queue

3 active projects totaling 370 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3active projects
370active MW
4total filed
Queue IDProjectkVMWResourceStatus
R34 Not reported 345 250 Wind Operational
H010 Not reported 161 182 Wind Withdrawn
J274 Not reported 161 100 Wind Operational
J289 Not reported 161 20 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.