Macon, MO interconnection queue

2 active projects totaling 508.4 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2active projects
508.4active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3404 Not reported n/r 300 Solar Withdrawn
J3758 Not reported n/r 300 Solar Active
J2050 Not reported 161 208.4 Solar Active
J3403 Not reported n/r 200 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.