Livingston Parish, LA interconnection queue

3 active projects totaling 2,507.6 MW in the MISO queue, plus 3 with terminal status (shown grayed).

3active projects
2,507.6active MW
6total filed
Queue IDProjectkVMWResourceStatus
J4071 Not reported n/r 1,500 Gas Active
APP-100259 Not reported 500 507.6 Hybrid Active
J4100 Not reported 500 500 Battery Active
J1538 Not reported 230 268 Solar Withdrawn
J900 Not reported 230 200 Solar Withdrawn
J2077 Not reported n/r 150 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.