Substation Scout

Livingston, MI interconnection queue

7 active projects totaling 2,437 MW in the MISO queue, plus 5 with terminal status (shown grayed).

7active projects
2,437active MW
12total filed
Queue IDProjectkVMWResourceStatus
J3799 Not reported 345 1,452 Gas Active
G217 CONS 94 Not reported n/r 510 Other Withdrawn
G216 CONS 110 Not reported n/r 280 Other Withdrawn
J2139 Not reported 345 250 Hybrid Active
J1911 Not reported 345 200 Solar Withdrawn
J2485 Not reported 345 200 Solar Active
J1917 Not reported 345 165 Solar Active
J2997 Not reported 120 160 Battery Active
J3858 Not reported 120 110 Solar Active
J427 Not reported n/r 110 Gas Withdrawn
J1925 Not reported 138 100 Solar Withdrawn
J2679 Not reported 120 100 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first