Substation Scout

Lincoln Parish, LA interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 3 with terminal status (shown grayed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
J2646 Not reported n/r 130 Battery Withdrawn
J2503 Not reported 115 100 Battery Withdrawn
J2795 Not reported n/r 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.