Substation Scout

Lincoln, MS interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
J3241 Not reported n/r 200 Solar Withdrawn
J3589 Not reported 115 160 Solar Withdrawn
J3310 Not reported n/r 150 Hybrid Withdrawn
J2903 Not reported 115 130 Hybrid Withdrawn
J3542 Not reported 115 80 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.