Lincoln, MO interconnection queue

3 active projects totaling 607.9 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3active projects
607.9active MW
4total filed
Queue IDProjectkVMWResourceStatus
E0017 Not reported 161 257.9 Battery Active
J3919 Not reported n/r 200 Solar Active
J2274 Not reported 161 170 Hybrid Withdrawn
J1268 Not reported 161 150 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.