0 active projects totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
J3422 Not reported 161 145 Solar Withdrawn
J2733 Not reported 161 126 Solar Withdrawn
J3061 Not reported 115 100 Hybrid Withdrawn
J3588 Not reported n/r 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.