Lasalle, IL interconnection queue
0 active projects totaling 0 MW in the MISO queue, plus 4 with terminal status (shown grayed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J2536 | Not reported | 138 | 200 | Battery | Withdrawn |
| J3670 | Not reported | 138 | 100 | Battery | Withdrawn |
| J3260 | Not reported | 138 | 97 | Solar | Withdrawn |
| J1197 | Not reported | 138 | 75 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.