Queue IDProjectkVMWResourceStatus
J2327 Not reported 345 300 Wind Withdrawn
J2367 Not reported 345 250 Wind Withdrawn
J2368 Not reported 345 250 Wind Withdrawn
J2518 Not reported 345 200 Battery Withdrawn
J997 Not reported 345 200 Solar Withdrawn
G446 Not reported n/r 19.5 Wind Withdrawn
G291 Not reported 41.6 19 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.