4 active projects totaling 425 MW in the MISO queue, plus 2 with terminal status (shown grayed).

4active projects
425active MW
6total filed
Queue IDProjectkVMWResourceStatus
J3291 Not reported n/r 200 Battery Active
J1392 Not reported 138 100 Solar Active
S1108 Surplus; J1190 n/r 100 Battery Active
J3664 Not reported n/r 80 Hybrid Withdrawn
J1265 Not reported 69 43 Solar Withdrawn
J1323 Not reported 138 25 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.