Substation Scout

Kittson, MN interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 5 with terminal status (shown grayed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
J3370 Not reported n/r 150 Wind Withdrawn
J612 Not reported n/r 150 Wind Withdrawn
G875 Not reported 115 80 Wind Withdrawn
J951 Not reported 115 80 Wind Withdrawn
G873 Not reported 41.6 20 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.