Kent, MI interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 8 with terminal status (shown grayed).

0active projects
0active MW
8total filed
Queue IDProjectkVMWResourceStatus
G217 CONS 111 Not reported n/r 630 Gas Withdrawn
J3446 Not reported 138 200 Battery Withdrawn
J3635 Not reported n/r 200 Battery Withdrawn
G943 Not reported 345 150 Wind Withdrawn
G944 Not reported 345 150 Wind Withdrawn
J1492 Not reported 138 150 Battery Withdrawn
G958 Not reported 345 120 Wind Withdrawn
J1980 Not reported 138 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.