Kandiyohi, MN interconnection queue

1 active project totaling 200 MW in the MISO queue, plus 8 with terminal status (shown grayed).

1active projects
200active MW
9total filed
Queue IDProjectkVMWResourceStatus
H033 Not reported 230 300 Wind Withdrawn
J3434 Not reported n/r 200 Solar Active
J781 Not reported 230 170 Wind Withdrawn
J086 Not reported 115 100 Wind Withdrawn
J027 Not reported 69 48.3 Wind Withdrawn
H067 Not reported 69 40 Wind Withdrawn
J288 Not reported 69 40 Wind Withdrawn
J574 Not reported n/r 40 Wind Withdrawn
J087 Not reported 69 30 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.