Substation Scout

Jefferson, IN interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 7 with terminal status (shown grayed).

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatus
G027 Not reported n/r 650 Other Withdrawn
G028 Not reported n/r 650 Other Withdrawn
J2823 Not reported 138 200 Battery Withdrawn
J2212 Not reported n/r 150 Solar Withdrawn
R1046 Replacing 150 MW of storage with solar/storage hybrid; Williams Solar 138 150 Other Withdrawn
J2150 Not reported 138 100 Solar Withdrawn
J2835 Not reported 138 50 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first