Jefferson, IL interconnection queue

3 active projects totaling 600 MW in the MISO queue, plus 3 with terminal status (shown grayed).

3active projects
600active MW
6total filed
Queue IDProjectkVMWResourceStatus
J2497 Not reported n/r 300 Battery Withdrawn
J3878 Not reported 345 300 Solar Withdrawn
J1241 Not reported 345 200 Solar Active
J3031 Not reported 138 200 Battery Active
J3847 Not reported 138 200 Solar Active
J1655 Not reported 345 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.