Jefferson, AR interconnection queue

9 active projects totaling 2,149 MW in the MISO queue, plus 10 with terminal status (shown grayed).

9active projects
2,149active MW
19total filed
Queue IDProjectkVMWResourceStatus
J2758 Not reported 230 500 Solar Withdrawn
J4082 Not reported n/r 500 Battery Active
J3030 Not reported 500 450 Hybrid Active
J2510 Not reported 230 350 Solar Withdrawn
J2515 Not reported 500 300 Solar Withdrawn
J2516 Not reported 500 300 Solar Withdrawn
J1283 Not reported 115 270 Other Withdrawn
J4080 Not reported 230 250 Solar Active
J3974 Not reported 230 200 Solar Active
J3984 Not reported 230 200 Hybrid Active
J328 Not reported n/r 160 Gas Operational
J2880 Not reported 230 150 Hybrid Active
J2881 Not reported 115 125 Solar Active
J3444 Not reported n/r 125 Solar Withdrawn
J1425 Not reported 115 114 Gas Operational
J3302 Not reported 115 105 Solar Withdrawn
J2459 Not reported 500 100 Battery Withdrawn
J2460 Not reported 500 100 Battery Withdrawn
J2231 Not reported 115 97.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.