Jasper, MS interconnection queue
1 active project totaling 350 MW in the MISO queue, plus 2 with terminal status (shown grayed).
1active projects
350active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1946 | Not reported | 230 | 350 | Hybrid | Active |
| J1020 | Not reported | 230 | 250 | Solar | Withdrawn |
| J3108 | Not reported | 161 | 180 | Hybrid | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.
Site Scanner