Jasper, IL interconnection queue

9 active projects totaling 1,007.8 MW in the MISO queue, plus 4 with terminal status (shown grayed).

9active projects
1,007.8active MW
13total filed
Queue IDProjectkVMWResourceStatus
J3995 Not reported 345 300 Wind Withdrawn
J2789 Not reported 138 250 Battery Withdrawn
J2922 Not reported 345 250 Solar Active
J3528 Not reported 345 225 Hybrid Active
J2131 Not reported 345 150 Solar Active
J3674 Not reported 138 100 Solar Active
J2918 Not reported 138 97 Solar Active
J1198 Not reported 345 51.8 Hybrid Active
G436 Not reported 345 50 Coal Operational
J881 Not reported 138 45 Solar Withdrawn
G983 Not reported 345 42 Coal Operational
G984 Not reported 345 42 Coal Operational
J3759 Not reported n/r 15 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.