Jasper, IL interconnection queue
9 active projects totaling 1,007.8 MW in the MISO queue, plus 4 with terminal status (shown grayed).
9active projects
1,007.8active MW
13total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J3995 | Not reported | 345 | 300 | Wind | Withdrawn |
| J2789 | Not reported | 138 | 250 | Battery | Withdrawn |
| J2922 | Not reported | 345 | 250 | Solar | Active |
| J3528 | Not reported | 345 | 225 | Hybrid | Active |
| J2131 | Not reported | 345 | 150 | Solar | Active |
| J3674 | Not reported | 138 | 100 | Solar | Active |
| J2918 | Not reported | 138 | 97 | Solar | Active |
| J1198 | Not reported | 345 | 51.8 | Hybrid | Active |
| G436 | Not reported | 345 | 50 | Coal | Operational |
| J881 | Not reported | 138 | 45 | Solar | Withdrawn |
| G983 | Not reported | 345 | 42 | Coal | Operational |
| G984 | Not reported | 345 | 42 | Coal | Operational |
| J3759 | Not reported | n/r | 15 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.