Queue IDProjectkVMWResourceStatus
J1119 Not reported 345 600 Gas Withdrawn
J2589 Not reported 138 150 Battery Active
J1310 Not reported 138 125 Solar Active
J2588 Not reported 138 120 Battery Active
J1052 Not reported 138 100 Solar Withdrawn
J1472 Not reported 138 100 Solar Active
J1552 Not reported 138 100 Solar Withdrawn
J2064 Not reported 138 100 Battery Active
J1014 Not reported 138 80 Solar Withdrawn
G234 Not reported n/r 22 Gas Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.