Jackson, IL interconnection queue

1 active project totaling 150 MW in the MISO queue, plus 5 with terminal status (shown grayed).

1active projects
150active MW
6total filed
Queue IDProjectkVMWResourceStatus
G099 Not reported n/r 250 Other Withdrawn
J2349 Not reported 161 200 Solar Withdrawn
G061 Not reported n/r 165 Other Withdrawn
J1111 Not reported 161 150 Solar Withdrawn
J1303 Not reported 161 150 Solar Active
J3516 Not reported n/r 83.4 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.