Substation Scout

Isanti, MN interconnection queue

2 active projects totaling 421 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2active projects
421active MW
3total filed
Queue IDProjectkVMWResourceStatus
J3465 Not reported n/r 211 Gas Active
G361 Not reported 69 210 Gas Operational
J2030 Not reported 69 120 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first