Substation Scout

Iron, MO interconnection queue

1 active project totaling 60 MW in the MISO queue, plus 1 with terminal status (shown grayed).

1active projects
60active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3202 Not reported 161 120 Solar Withdrawn
J1213 Not reported 138 60 Hydro Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.